A Corbelled Brick Cornice Pushes the Trough Out, So Measure the Offset First

A corbelled brick cornice can push a gutter trough 2 to 3 inches off the fascia, which changes the hanger, the guard clearance and the quote.

Many older St. Louis brick houses have a corbelled cornice under the eave, a set of brick courses stepped out past the wall face. It is a small detail, and it changes the gutter job more than many homeowners expect. The cornice pushes the trough away from the wall, its top can sit higher than the fascia line, and it changes where a hanger can reach. A gutter hung to the fascia without anyone looking at the brick can end up with its front lip behind the cornice edge, a hanger bent to reach it, or a trough that cannot hold its slope. Each of those shows up later as water running down the brick below the eave, a guard that will not seat flat, or a section that sags in the first hard rain.

Measure the projection before anything else

The number that matters is how far the cornice reaches past the wall face. From a stable ladder at a corner, measure from the wall face to the outer edge of the top course, then measure the bottom course the same way. Write both numbers down. If the cornice runs straight and projects two inches or less, a standard fascia hanger with a longer bracket often works. Once it projects three inches or more, or the courses are uneven from one corner to the next, the hanger type has to change, and the quote should say so in writing.

Check the wall plumb as well. St. Louis clay soils move with the seasons, and a brick wall that has settled or leaned will show open mortar joints and a cornice that is not parallel to the fascia. If the cornice is out of line by a half inch or more over the length of a run, a single straight trough will not sit at a constant height along its length. The crew should sight the cornice edge along the run before the trough is set, and the photos from that check belong in the file.

Look at the top surface too. A corbel top is often flat or capped with mortar, and rain that lands there tends to run back toward the wall rather than out over the trough. If the joints on the top are open, water sits in them and freezes there in January, and the freeze pushes the mortar apart a little more each winter. A trough set just in front of that ledge will catch some of the water and throw the rest down the brick face.

Hangers and the spacer question

There are three common ways to hang a trough off a cornice house, and each one has a different way of failing. A fascia hanger with a spacer block carries the trough out past the cornice and ties back into solid fascia. It is a direct fix when the fascia is sound and deep enough to take the screws. A spike and ferrule hanger runs back to the rafter tails, which is strong when the tails are exposed and sound, but it sets the trough height by where the tails sit rather than by the cornice. Hidden hangers clip to a drip edge or a fascia board, and they need solid wood behind the metal. A cornice house does not always have that, especially where an older fascia has been patched or where the rafter tails have softened.

Ask which of these the quote uses and why. If the crew plans to drill into the brick cornice or the mortar joints, the hanger has a different anchor, and the mortar will need repointing after the fastener comes out. That repointing is a separate trade, and it is often billed separately. A quote that lists hangers and nothing else leaves the brick work open, and the homeowner finds the gap when the first hanger holes show up as bare holes in the mortar.

Spacing matters more on a cornice than on a plain eave. The hanger that carries the front of the trough takes the weight of the water and the snow that slides off the roof above. If the front hangers are spaced for a plain eave and the cornice forces a longer bracket, the bracket will flex under a heavy load unless it is braced back to something solid. Ask the crew to show you the bracket type and the spacing on the scope, not only the spacing on the back section.

Guards need a clearance line

Gutter guards that sit on the shingle edge or lock onto the trough lip need room at the front and at the top. A cornice that projects into the path of the guard can lift the front edge, leave a gap where leaves and seed pods get in, or stop the guard from lying flat against the trough. Measure the clear space between the cornice top and the shingle edge before the guard order is cut. If the space is short, the guard maker may need a narrower profile or a fitted front piece, and that changes the price per foot on that run.

Water also moves differently on a cornice house. Rain that comes off the cornice top can run over the front of a guard and drop past the trough entirely, especially in a hard storm when the wind pushes sheets of water sideways. A drip edge or kick-out fitted at the cornice top can send that water into the trough instead. It is an added piece with its own line on the quote. Without it, the stain line on the brick below the eave tells you where the trough is missing water, and the stain usually shows within a season.

Freeze and thaw matters here as well. A guard with a fitted front holds snow and ice at the edge longer than an open trough does, and that load sits right on the cornice-side hangers. If the quote includes a guard on a cornice run, ask whether the hanger spacing was checked against the guard weight, and whether the guard is rated for the load of a St. Louis ice storm.

What it costs

The cornice does not make a gutter job expensive by itself. What it adds is labor and parts that a plain eave does not need: longer or specialty hangers, spacer blocks, extra time to fit the trough around the brick, a drip edge or kick-out at the top, and mortar repair where hangers come out. Each of these should appear as its own line on the quote. A single per-foot number that hides them tells you nothing about what the cornice is costing you.

Ask whether the quote is priced for the projection you measured. A quote written from a phone photo or a view from the ground may assume a flat eave, and the price will change once the crew finds the offset on the ladder. That is not a reason to refuse the job, but it is a reason to know the number before the trough is cut to length. Once the crew has measured the cornice and written the projection on the scope, the price should not move unless the wall or the fascia turns out to be different from what was written down.

Repointing is the line most often left out. The amount depends on how many hangers come out, how many joints are open, and whether the mortar matches the existing brick. A quote that names the repointing as a line, with a count of the joints it expects to fill, gives you a number to compare. A quote that says the brick will be left as found, with no word about the holes, leaves the question open until the holes are already there.

What to ask

  • What is the cornice projection, in inches, at the top course and at the bottom course?
  • Is the wall plumb along the cornice, and what did the sight check along the run show?
  • Which hanger type is in the quote, and where does its back anchor land?
  • Is mortar repair after hanger removal a separate line on the quote, and who does the work?
  • What is the clear space between the cornice top and the shingle edge, and does the guard fit it?
  • Is a drip edge or kick-out included for the cornice top, and is it listed on its own line?
  • Will the crew photograph the cornice from the ladder and send those photos with the written scope?

Keys Roofing documents the cornice with dated photos and measurements, and puts the written scope in your hands before the trough goes up. If you have a brick cornice under your eave and want the projection checked before you choose a hanger or a guard, call the office at (314) 220-2333 and ask for the cornice measurement to be written into the scope.

Ask about the two weeks

Book it before the leaves have finished falling

The check that matters most is the one almost nobody does: a hose down every downspout once the trees are bare, with somebody at the bottom watching where the water actually comes out.

If you would rather not be the person on the ladder for that, say so, and tell us how many storeys we are talking about.