A duplex gutter job needs each unit's outlets counted apart, so the trough, downspouts and drain routes match the way the house is actually used.
A duplex sits under one roofline, so the gutter looks like one job from the street. Inside, it is usually two households. Each side has its own back door, its own patio or stoop, its own water bill and often its own yard strip. When the trough goes up, every outlet decides where water lands for one of those households, and the quote rarely says which side each outlet serves. This page covers how to split the outlets by unit before you accept any number, so the drainage you pay for is the drainage each owner or tenant actually gets.
Gutters and guards
Start with the roof. On most duplexes the two units share a continuous ridge, but the roof planes may still drain to different eaves. Walk the house and mark each slope with a short note: front, rear, and any side where a wing or addition drops water onto the other unit. Each slope that drains toward one unit needs its outlet on that unit's side, or the water crosses the shared wall line and lands in the neighbor's yard.
Count the downspouts by side, not by total. A common mistake is a quote that lists eight outlets for a building with no mark for which four serve the left unit. If the crew sets all eight on the left because that is the easiest drop, the right unit's rear slope has no outlet and the trough overflows at the far end. Ask the estimator to draw the outlets on a sketch and label each one with the unit it drains toward.
Look at the wall between the units. Where the trough passes over a shared party wall, the hangers, end caps and joint seal all sit on a line that two owners may both care about. A single trough run that crosses the line is still one piece of metal, so decide in writing who maintains the section over the wall. The installer can run the trough in one continuous piece, but who maintains it and who pays for a later repair belong in the paperwork before the first hanger goes in.
Downspout splash is worse on a duplex because the outlets sit close to the walkway between the doors. In St. Louis clay, water that lands at the outlet and has nowhere to go will pool, soak into the clay and then freeze in January. Plan a splash block or extension for each outlet and check that it does not point toward the other unit's foundation or stoop.
What it costs
A duplex gutter quote gets more useful when it is split into two lines, one per unit. That does not mean two bids. It means the same bid shows the footage, outlet count and extension count for the left side and the right side separately. If the total is a single number with no split, you cannot compare it to a neighbor's price or check whether the other unit is paying for outlets on your side.
Ask for the cost of the shared section as its own line too. Where the trough crosses the party wall, the crew may need an extra hanger, a longer section or a tee to keep the run level and draining. That line is part of the job, not a surprise. Two owners who agree on the split before the work starts avoid the argument that comes after the first heavy rain.
Guards add their own split. Guard priced by the foot for the whole building means one unit may pay for guard on a run that mainly drains to the other unit. If the guard is optional, decide it by unit. If both units want it, the price for each side should still show on the page.
What to ask
Ask each estimator these five questions and write the answers beside the quote:
- Which outlets drain toward the left unit, and which toward the right?
- Where does each downspout land, and what is the splash plan at grade?
- Who is responsible for the trough section that crosses the shared wall line?
- Is the price split by unit, and does the total equal the sum of the two sides?
- Does the work need a permit, and which city or county desk would the crew call to ask?
The permit question is one many owners skip. Most gutter-only work does not need a roofing permit in St. Louis County, but a downspout that ties into a storm sewer or changes the grade can draw a question from a building or public works desk. Call the desk for the city or county where the house sits and ask whether the planned outlets need a review. Write down the name of the person who answered and the date of the call.
Ask too who signs off on the outlet locations before the trough is cut. On a duplex, one owner often assumes the other has agreed. A written sign-off from both owners, or from the property manager, stops the crew from moving an outlet to the side that looks easiest on install day.
Check the freeze before the first January
A downspout that empties onto a shared walk freezes into a sheet of ice. Both units use that walk, and both owners may be exposed if someone slips. The fix is simple: route the outlet to daylight, to a splash block on the owner's own strip, or to an underground line that the owner has agreed to maintain. Pick the route before the crew arrives, not after the first ice shows up in February.
Ice also builds at the eave where the trough meets the shingles. A long trough pitched toward a low outlet can hold water until the next freeze. If one unit's outlet is undersized for its side of the roof, the trough fills, ice forms along the lower course, and water backs up under the shingles on that side only. Count the outlets against each side's roof area before the crew starts.
When the answers do not add up
If the estimator cannot say which outlets serve which unit, the quote is not finished. Ask for a revised sketch, not a verbal promise. If the other owner or the property manager has not agreed to the split, hold the signature until they have. A duplex gutter job is two decisions under one invoice, so the written split is what keeps each owner paying only for the drainage their side receives.
Ask about the two weeks
Book it before the leaves have finished falling
The check that matters most is the one almost nobody does: a hose down every downspout once the trees are bare, with somebody at the bottom watching where the water actually comes out.