A Gutter Job Split Across Two Visits Needs a Matching Plan

When gutter work stops and restarts, both halves must still match in profile, coil lot, outlets and hanger spacing. Ask for each in writing.

A gutter job that stops at the end of one day and starts again weeks later is common in St. Louis. Weather, a short crew roster, a homeowner who wants the front done before the back, or sealant that needs warmer days can all split the work. The second visit is where trouble starts, because the trough that goes up in the spring is not always the trough that went up in the fall. This page covers what has to match before the crew leaves the first section, and what to ask before the second one arrives.

Gutters and guards

Start with the profile. Seamless aluminum gutter comes in a few common profiles, and a K-style trough and a half-round trough do not join. If the first half is a five inch K-style, the second half must be the same five inch K-style at the same depth. The profile name on a quote is not enough. Check the installed section with a tape for face height and back lip before the second crew shows up. A quarter inch of difference in the face is visible from the curb and changes how the trough lines up at a corner.

Next is the metal and the color. Seamless gutter is formed on site from coil, so each coil has a lot number. Two coils sold under the same color name can still differ in shade if they came from different lots. Ask the crew to record the coil lot on the job sheet for the first run, and ask that the second run come from the same lot. If the coil runs short before the second run is finished, the crew should stop and tell you rather than switch to a near match. A shade difference at a corner where two runs meet is hard to fix without replacing a section.

Downspout size and outlet placement come next. Count the outlets on the first run and mark where each one sits on the fascia with a chalk line before the crew leaves. The second run should use the same downspout size and the same outlet count for the roof area each one collects. A hip roof split across two visits may drain to outlets on both sides of the house, and the second run's outlets must still match the roof area each one takes. If the first run uses a 2x3 downspout at each end, the second run should not drop to a 3x4 without a written reason. If the outlet count is in doubt, work it out from the roof area each downspout drains before the second visit is booked.

Trough pitch is the last geometry check. Gutter should drain toward the outlets, and the pitch on the first run sets the slope the second run has to meet at the joint. Ask the crew which slope they set on the first run and at what point they measured it. A second crew that sets pitch from a different reference point can leave a low spot right at the seam, where water will sit after every rain.

The seam between the two visits

The seam is the weakest point of a split job. A run that ends in the open is not finished, and an open end is not an end cap. The crew should leave the last hanger at the end of the first run tight, with an end cap sealed to the trough, and should not leave the trough unsupported across the gap. Ask how the open end is protected in the interval. If a storm comes before the second visit, water will run toward the open end and drop off it. Ask where that water will go and whether someone will check the ground under the open end after heavy rain.

Metal moves with temperature. An aluminum run set in November sits at a different length than the same run in July, and a St. Louis summer can push a joint open if the gap was set for a cold day. A freeze and thaw cycle in winter adds another movement the joint must allow. The second section will be set at a different temperature than the first, so the gap at the seam has to be planned from the temperature on each visit. Ask the crew what temperature they set the joint gap at, and whether the second section will be set with that same allowance.

Sealant has its own timing. Gutter sealant at end caps and outlet joints needs warm days to cure properly, and late fall can reach the cold limit printed on the tube. If the first section's joints were sealed in October, check whether the sealant has set before the second section is joined to it. A joined run that is hose-tested only on the first half tells you nothing about the seam. Ask for the hose test on the full joined run, with water running from the far end toward the outlet.

Fasteners and hanger spacing must match across the seam too. The first run's hangers may land on rafter tails or fascia blocking, and the second run may not have solid wood at the same points. A hanger that lands on a fascia splice, or in a spot where an old bracket was pulled, will let go first. Ask the crew to pull-test one hanger on each side of the seam before the trough goes up. Keys puts a written scope with photos and measurements in the homeowner's hands, so you can compare the hanger locations on the second visit against the record from the first.

What it costs

Splitting a job across two visits can add cost in ways a single per-foot figure does not show. Each visit may carry its own mobilization charge, which covers bringing the crew, ladders and tools to the site. Ask whether the second visit is billed as a separate trip and whether that charge is in the quote. A per-foot gutter price does not include a return trip unless the quote says it does. The same applies to a second haul of scrap and a second ladder setup at the eave.

Material cost also shifts. If the second run needs a new coil because the first coil is short, its price may differ from the first order, since aluminum is bought on a market. Ask whether the price is locked to the order date or the delivery date. Ask what happens to leftover stock as well. Unused gutter stock has a return price, and it may be credited or it may not. Settle that before the order is placed, not after the crew has cut the metal.

Labor can move too. A crew that has to re-set a ladder, re-tie to the existing hangers and re-check the pitch on the second visit is doing work the first quote may not have counted. Ask whether the second visit's labor is priced at the same rate as the first, and whether any re-check of the first section is included.

Finally, ask whether a delay between visits changes the price. A quote written in fall for a spring finish can carry different material and labor prices by spring. Get the price terms in writing with a date on them, and ask what triggers any change.

What to ask

Before you agree to a split, ask these questions and get the answers on paper:

  1. Which profile and face height is the first section, and will the second section match it at the same depth?
  2. What is the coil lot number on the first run, and is the second run cut from the same lot?
  3. Where are the outlets on each run, and how many downspouts drain each roof area?
  4. How is the open end protected between visits, and who checks it after a heavy rain?
  5. What joint gap temperature was used, and is each joint sealed and cured before the second section is joined?
  6. Will the crew hose-test the full joined run, and not only the first section?
  7. Is each visit billed as a separate trip, and what does each one include?
  8. Who holds the leftover stock, and what is its return price?

If any answer is missing, the job is not ready to split. Call the Keys office at (314) 220-2333 and ask for the answers in writing before the first crew loads the truck. A written answer costs little to get before the work starts and a great deal to fix after the seam leaks.

Ask about the two weeks

Book it before the leaves have finished falling

The check that matters most is the one almost nobody does: a hose down every downspout once the trees are bare, with somebody at the bottom watching where the water actually comes out.

If you would rather not be the person on the ladder for that, say so, and tell us how many storeys we are talking about.