A Gutter on a Plaster-and-Lath Eave: Find the Wood Before the Hanger Goes In
A plaster-and-lath soffit can look solid while the hanger bites only the finish, so find the framing behind it before the trough is set.
Many older St. Louis houses have a soffit made of plaster over wood lath instead of vinyl or aluminum panels. From the ground the ceiling looks solid, but it is a finish coat pressed over thin strips of wood fixed to the rafter tails or to a plank ceiling. A gutter hanger that grips only that plaster will pull loose the first time the trough carries a load of wet leaves through a March thaw. Before anyone sets a hanger, the job needs to know where the solid wood sits behind the ceiling line.
This is most common on houses built before the middle of the last century, where the cornice carries the gutter at the roof edge and the soffit runs underneath the rafter tails. Where the plaster meets the fascia, a hanger screw has to pass through the plaster and into framing. Lath gives a screw almost nothing to hold. A fastener driven through lath and plaster can seem tight for a season, then back out as the wood shrinks in dry summers and swells again in wet winters. St. Louis freeze and thaw cycles add to that movement, because the frozen trough pulls on every hanger each cold snap.
Find the wood before you choose the hanger
Start from the attic if there is access above the soffit. Look at the rafter ends from the top side and mark each one with a pencil on the plaster below. The spacing of the rafters tells you where the hangers should land, and a hanger that lands between two rafters has nothing solid to bite. If there is no attic access, the crew can tap along the ceiling with the handle of a screwdriver. Solid framing gives a dull, firm sound. Hollow lath gives a higher, ringing sound.
Next, a small test hole can confirm the wood. A pilot bit of about 1/8 inch goes through the plaster at each marked spot. A hole that drops into dense wood face is a good sign. A hole that opens into an empty cavity means the hanger line has to move, or the framing needs a new nailer added first. The test holes are then patched before the trough goes up, so the plaster is not left with open holes that let water into the soffit.
Ask the crew to record where each test hole landed and how deep the screw goes into solid wood. A hanger screw should bite a real depth into framing, not just the thickness of the plaster. The quote should name the screw length and the minimum depth into wood, because that number is what separates a hanger that holds from one that works loose.
What the crew can do with the plaster
There are three common approaches. The first is to fix a new nailer board to the rafter tails or to the fascia face, which gives every hanger a solid wood target. That means opening the plaster along the eave, so the patch and repaint of the ceiling line become part of the work. The second is to remove the plaster soffit along the run and replace it with a vented panel system. That changes the look of the eave, the attic ventilation, and the price, so it is a decision for the whole eave and not just the gutter line. The third is to use hidden hangers only where the wood has been confirmed by test hole, and to leave the plaster alone everywhere else. That approach is the least work, but it depends on the test holes finding wood at every hanger position.
None of these is wrong by itself. The right one depends on how much of the plaster is sound, whether the fascia is solid, and whether you want the ceiling line kept as it is. A crew that cannot say which of the three it will use, or that plans to screw straight into plaster without testing, is not describing a repair you can rely on.
What it costs
The cost of a plaster eave depends mostly on how much plaster has to be opened and how many nailer boards have to be added. A short run with solid rafter tails and a sound fascia is a small job. A long run with broken plaster, missing framing and a fascia that has to be shimmed is a much bigger one. The plaster patch and repaint are separate from the hanger work, and they often get overlooked in a quote. Ask whether the patch and paint are included, what color match they assume, and whether the crew will leave the ceiling line in the state it was found.
If the plaster cracks when the test hole is opened, the repair can grow. Ask the crew what they will do in that case, who decides, and whether they will stop and call you before they open more plaster. A quote that prices the nailers by the foot, with the footage stated, is easier to check than one that folds the framing into a single labor line.
What to ask
- Where does each hanger screw land, and how deep does it go into solid wood?
- Will the crew test-drill the plaster at each hanger line before the trough goes up?
- If a test hole finds no wood, which of the three approaches will you use, and who approves the change?
- Is the nailer board priced by the foot, and is the footage named in the quote?
- Who patches the plaster and matches the paint, and is that in the price?
- What is the screw length in the quote, and what is the minimum depth into framing?
If the answers are vague, call Keys Roofing at (314) 220-2333 and ask for the test hole plan in writing before the crew is booked. A plaster eave should be measured and opened the same way every time, so the answer you get on the phone should match the sheet you are handed.
Ask about the two weeks
Book it before the leaves have finished falling
The check that matters most is the one almost nobody does: a hose down every downspout once the trees are bare, with somebody at the bottom watching where the water actually comes out.
If you would rather not be the person on the ladder for that, say so, and tell us how many storeys we are talking about.
Straight through to the Keys office. Roofing, gutters and downspouts only, across greater St. Louis.