A new room changes where the roof water runs, so the old downspouts and outlets need measuring before the new trim goes up.

A room addition changes where the roof water goes before anyone has poured a footing. The new roof line usually meets the old one at a wall or a valley, and the gutter that ran cleanly along the back of the house may now end under a new slope, dump onto a new porch roof, or sit where the trough has nothing to catch it. If the gutter was measured for the house as it stood, those measurements are wrong for the house as it will be.

This page is for the homeowner who has a finished addition on paper, or a contractor's drawing with the new room drawn in, and needs one fact before signing: where each downspout outlet will sit once the new roof is on. The answer decides how many feet of gutter the job needs, how many outlets it takes, and whether the old downspout can stay.

Why the old run stops being the right run

An addition usually adds roof area in one of three ways. A new gable can run across the old roof and drop its water into a new trough. A shed or lean-to can tie in under the existing eave. Or a hip can be carried over the new room, which makes a valley where the two roofs meet. Each one moves the water. A valley delivers more flow to one point than either roof does alone, and it often needs its own outlet rather than sharing the old one.

The old downspout can end up in the wrong place for two reasons. First, the new roof may cover the spot where the old outlet sat, so the trough now runs under a slope it was never sized for. Second, the outlet may stay where it was while the water arriving there doubles. Either way, a gutter that worked for twenty years can overflow the first time a St. Louis storm drops two inches of rain in an hour.

What to measure before the trim goes up

Walk the run with a tape and write down four numbers for each section. The first is the length of trough that drains to each outlet. The second is the roof area that feeds it, measured from the ridge to the eave on each slope, with the addition's slope counted separately. The third is the height of the eave in the new layout, because a trough set against the old fascia may sit lower than the new roof edge. The fourth is where any valley lands on the trough.

Then compare those numbers with the drawing. A contractor who takes the measurements on the actual roof will catch what a drawing misses. The addition may not have been built to the drawing's exact lines, and a few inches of difference at a valley can move an outlet by a full section.

The valley is the spot to check first

Many problems show up where the new roof meets the old at a valley. Water collected from both slopes arrives in one place, so the trough at that point needs a larger outlet or a second one. A single downspout at the bottom of a valley can be overwhelmed in a heavy storm, while the same pipe at the far end of a plain run handles its load without trouble. Ask where the valley drains, how many inches of trough feed the outlet, and whether the outlet is sized for that water. That one question separates a plan from a guess.

Where the old downspout can stay

Keeping an existing downspout is sometimes fine. If it sits on a section of the old run that still drains only the old roof, and nothing new is added above it, it can stay where it is. If the old outlet now sits under the new slope or under the addition's valley, it has to move. Moving it means a new hole in the trough, new elbows, and a new bottom route. Ask the contractor to mark each old outlet on the drawing as kept, moved or retired, so nothing is left as a loose end.

Permits and the municipal desk

Many St. Louis County municipalities treat an addition as a building permit, and the roof part of that permit is reviewed as part of the whole. A gutter change that adds an outlet at a new point, or changes where water discharges near a lot line, can draw a question from the city even when the roofer is only replacing trim. Check with the local permit desk before the gutter order is placed, because a changed discharge point can be reviewed differently from a like-for-like swap.

The sequence matters. The gutter run is usually set after the new roof is sheathed and the fascia is in, which means the outlet positions are effectively fixed once the roof framing is done. If the addition's roof is still open when the gutter crew arrives, the outlet placement can still be reconsidered. Once the trim is painted, moving an outlet costs more. Ask the office at Keys Roofing what the paperwork for the gutter portion needs, and confirm the exact requirement with the city.

Gutters and guards

If the run is getting a guard, the guard has to be fitted to the new trough, not the old one. Guard sections are cut to the trough profile and the hanger line. A new section that meets an old section at a corner may not seat, and a gap at that joint lets leaves in. Take the guard length and corner count from the same layout sketch that places the outlets. Mixing an old section with a new guard on the same run is a common reason for a loose fit.

Freezing matters too. In St. Louis, water sits along a trough through the freeze thaw cycle, and a new section pitched by eye can hold a puddle where the old run used to shed. Check the pitch on the new section with a level and a hose before the guard goes on, and watch the first rain after the install.

What it costs

The cost of an addition gutter job is usually driven by three things: the linear feet of new trough, the number of outlets and elbows, and the work of moving or capping old outlets. A price that covers the gutters as one figure hides all three. Ask for the trough footage by section, the outlet count by location, and a separate line for each old outlet that is moved, capped or retired. A moved outlet usually costs more than a new one placed where the plan called for it, because the old hole has to be closed and the new run fitted around the existing trim.

Ask also how the valley is priced. A valley trough is cut and fitted by hand, and the price should show that work. If guards are part of the request, ask whether the price assumes the old guard is reused or replaced, because a guard fitted to a changed run can need a second trip.

What to ask

  • Where does each downspout outlet sit on the new roof, and is that point marked on a sketch I can keep?
  • Which old outlets stay, which move, and which get capped?
  • Is the valley drained by its own outlet, or shared with a run that already carries water?
  • How many inches of trough feed each outlet, measured on the roof rather than the drawing?
  • Does the price list the moved and capped outlets as separate lines?
  • Who checks the city's requirement for any new discharge point before the order is placed?
  • Will the new section be checked with a level and a hose before the job is signed off?

Ask Keys Roofing for the written scope with photos and measurements before any metal is cut, and keep a copy with your addition plans. If you are weighing an addition now, call the office at (314) 220-2333 and ask for the outlet layout to be measured on site.

Ask about the two weeks

Book it before the leaves have finished falling

The check that matters most is the one almost nobody does: a hose down every downspout once the trees are bare, with somebody at the bottom watching where the water actually comes out.

If you would rather not be the person on the ladder for that, say so, and tell us how many storeys we are talking about.

(314) 220-2333

Straight through to the Keys office. Roofing, gutters and downspouts only, across greater St. Louis.

A name and a number is enough. Someone from Keys will call you back.