The water path / The gutter year
Seasonal / the calendar
A Slate Eave Pushes the Guard Lip Out, So Measure the Standoff First
A slate eave changes where a gutter guard has to sit, so measure the standoff before you order the mesh.
A slate eave is thick, and it sticks out. That changes where a gutter guard has to sit. On a shingle roof, the mesh lip usually tucks just under the shingle edge with a short standoff. On slate, the lower edge of the course can sit well out past the fascia face, and a guard bracket that worked on the last house may leave the mesh floating under the slate or pressed up into it. Either way, water finds the gap. This page is for the homeowner deciding whether a guard can go on a slate eave and what the quote has to say before any mesh is cut.
Why the standoff matters more than the mesh
A gutter guard works by letting water pass through the mesh or over the lip into the trough while leaves stay on top. The part that decides whether it works is where the front lip sits relative to the roof edge. If the lip is too far out, water that runs off the slate edge falls past the trough and wets the fascia below. If the lip is pushed up under the slate with no room, the slate cannot shed its water cleanly, and the lip can bend or crack the lower edge when someone walks the eave.
Standoff is the distance the guard is held off the fascia, measured at the bracket. On most eaves it is one number. On slate it has to clear the thickness of the slate course, the drip edge if one is present, and the gap the water needs to fall without wicking back along the metal.
Slate also sheds fine grit when it is cut, walked on or pried, and that grit lands in the trough if the guard is set too low to keep it out. A guard that sits tight to the slate can trap that grit on the mesh surface, where it stays until someone brushes it off. Ask the crew how they plan to protect the trough during any slate work, not only how they plan to fasten the guard.
Measure the eave before the order
Do the measuring with the guard's actual trough profile in mind, not a generic number from a sales sheet. The steps are simple:
- Measure from the fascia face to the lowest point of the slate edge at three spots: near the corner, mid-run and near the downspout outlet. Slate is rarely flat along an eave, and one reading is not enough.
- Note whether there is a drip edge between the slate and the fascia, and what its face looks like. A metal drip edge changes where the lip can land.
- Check the trough's top edge height against the lowest slate course. If the trough top sits above the slate edge, the guard lip has to drop below it, not sit level with it.
- Ask the guard maker what standoff their bracket is built for, and write that number beside your three readings.
If the three readings disagree by more than a little, the eave is not square to the fascia. That happens on older houses where the rafter tails have shifted over the years. The guard bracket will have to adjust spot by spot, and the quote should say so rather than assuming one bracket height across the whole run.
What slate does to the bracket
Slate is heavy and rigid. It does not give under a bracket the way asphalt does, so a slate course at the eave can hold a bracket hard against it and crack a corner if the bracket is driven too tight. Brackets that clip under the slate edge need a sound place to clip, and on some eaves the only solid support is the fascia board or a nailer set behind the slate. A bracket that lands on a gap between nailers will flex, and over time it will loosen.
Freeze and thaw matter here too. St. Louis winters push water into every joint, and a standoff that leaves a little air between the mesh and the slate edge lets snow and ice settle in the gap. Ice held there lifts the lip. Measure for clearance you can keep after a hard freeze, not only the clearance that looks right on a dry day in June.
Questions that belong on the quote
- What standoff is the guard priced on, in inches, at the bracket?
- Who checks the slate edge for cracks before the brackets go on, and is that check written down?
- Are the brackets fastened to the fascia, a nailer or the trough, and which one does the crew drill into?
- If a bracket cannot find solid wood at a spot, what happens next? Is there a named price for a sister board or a reset?
- Does the price include removing and resetting any guard that has to come off for a later slate repair?
Keys Roofing installs Atlas and Malarkey asphalt shingles. If your house has slate on the main roof, ask any contractor who handles slate directly whether they will set the guard, and who answers if a slate edge cracks during the install. That question belongs to the person on the roof, not only to the person who sold the guard.
What the homeowner does next
Before you accept a guard quote on a slate eave, have the three standoff readings in hand, the trough top height and the bracket standoff the maker uses. Put them on one sheet with the quote. If the numbers do not line up, the quote is not finished yet. A contractor who can answer each question in writing has done the measuring. A contractor who waves at the roof and says it will fit has not.
If you have questions about your eave before you order, call the office at (314) 220-2333 and say you have a slate edge. Give the three measurements. That is enough to tell whether the job needs a site visit or a short answer by phone.
Ask about the two weeks
Book it before the leaves have finished falling
The check that matters most is the one almost nobody does: a hose down every downspout once the trees are bare, with somebody at the bottom watching where the water actually comes out.
If you would rather not be the person on the ladder for that, say so, and tell us how many storeys we are talking about.
Straight through to the Keys office. Roofing, gutters and downspouts only, across greater St. Louis.