The water path / a gutter and drainage manual for St. Louis Keys Roofing / (314) 220-2333
Seamless Gutters STLGutters · guards · drainage Call (314) 220-2333

The water path / The gutter year

Seasonal / the calendar

Gutters on Aluminum Lap Siding Hang From the Trim, Not the Panel

Aluminum lap siding cannot carry a gutter hanger, so ask what each hanger goes into, how the bottom course is unlocked, and who reseats it.

If your house has aluminum lap siding, the gutter does not hang from the siding. It hangs from the wood behind the eave, usually a fascia board or the tails of the rafters, and the siding has to be kept out of that job. This is the part of a gutter install that homeowners rarely see coming, because the trough looks the same on any house. On aluminum lap siding it is a different job, and the quote should say how the bottom course of siding gets handled before the first hanger goes in.

Gutters and guards

Aluminum lap siding comes in horizontal panels. The bottom course hooks into a starter strip or a J-channel, and each panel locks into the one above it along its top edge. Every panel has room to slide with the weather. In a St. Louis summer the metal warms and grows along its length, and it needs that room to move without buckling. In a winter freeze the metal shrinks, and the lock edges can crack if they are forced. A gutter hanger screwed through a panel into the wall behind it pins that panel in place. The metal still wants to move, so it tears at the nail hole, or the face bows out in a long wave. The bow shows from the sidewalk long before any water appears inside.

The fix is to put every hanger into solid wood. On most houses with this siding, that means a fascia or trim board at the eave, a rafter tail, or a nailer somebody added behind the fascia years ago. If the fascia is thin, the hanger may need a longer screw that reaches past the trim into the rafter tail. If the fascia is soft or gone, the crew should say so before the trough goes up. A hanger driven into rotten wood lets go in the first heavy snow, and the trough then pulls on the siding around it.

Hanger spacing is closer at the corners and at the downspout outlet, where the water and the weight concentrate. On a long eave with a single outlet, the crew should mark each hanger point on the fascia before drilling, so you can see the spacing with your own eyes. Marks on the wood are easier to check than a sentence in the scope.

Gutter guards on this kind of house have a second problem. Guard brackets fastened to the fascia or to the trough back edge sit at about the same height as the top lock of the bottom siding course. A bracket that is set too low, or a guard that is too wide for the trough, can push against the top of that course. Ask the crew to show you the bracket spacing against the actual siding where it lands, not against a sample on the truck.

Ice at the eave adds another reason to keep the siding out of the hanger line. Water that backs up behind a trough in a freeze can run under the bottom course. If the siding is pinned to the wall by a hanger, the water has no path out, and the wet panel stays cold and brittle through the thaw. A trough that is hung from wood and sits clear of the panels lets that water drain down the wall instead.

What it costs

The gutter line on a house with aluminum lap siding has more pieces than a per-foot price shows, and a quote that names those pieces is easier to compare. The bottom course has to be unlocked wherever the trough sits. Some crews lift the bottom course off the starter. Others release the top lock on a few panels and work the course loose. Either way the panels come off the wall, the hanger goes in, and the panels go back on. That takes labor, and the labor should be a line in the quote, not something folded into the trough price.

Trim work comes next. If the fascia is split, or old hanger holes are open, the trim gets a patch or a new board before the new hangers go in. Ask whether that patch is priced by the foot or as a single line, and whether the replacement wood matches the species and thickness of what is there now. A thin board under a long trough can sag before the gutter does, and the sag shows as a dip in the drip line.

Paint matters on exposed edges. When panels are unhooked, the lock edges and the cut ends can show scuffs or a bent crease. Some crews straighten the panel in place. Others replace it with a matching piece. Ask whether a matching panel is included in the quote and what color it is. Aluminum that has sat on a wall for decades does not always match a new panel from the truck, and a visible patch can look worse than a faded run. The quote should name the color, or say that the crew will look for the closest match and report what it found.

If you want guards on the same line, the brackets add to the count of hanger points on the trim. Count the bracket points on the quote, not only the feet of guard. Each bracket is a fastener going into the same fascia, and the fascia can only take so many before it splits at the grain.

Crews sometimes bill a second visit to reseat panels that did not lock on the first pass. A cold morning can make the lock edges too stiff to seat, and a crew that comes back on a warmer afternoon may need an extra trip. Ask whether a second trip is in the quote, and what it costs if the crew has to return for siding alone.

What to ask

Ask who unhooks the bottom course of siding, and whether that same person reseats it. Ask how many panels will come off, and whether the crew will mark each panel with its position so the siding goes back up in the same order. Ask what happens if a panel cracks while it is being lifted. A straight answer names a replacement panel, a price for it, and whether the damaged piece stays on the drive so you can see it.

Ask what each hanger goes into. Ask the crew to name the wood at every hanger point, and to show you a hanger screw that has been pulled out and checked for solid bite. If the answer is the fascia, ask how thick the fascia is and whether it is solid at the corners, where the miters tend to open first.

Ask whether the quote includes working on the siding in cold weather. Older aluminum panels get stiff below freezing, and the lock edges can split when they are pried. A crew that works in January should say how it will handle that, and whether it will stop when the panels are too cold to move without damage.

Ask who sets the ladder and where it lands. Leaning a ladder against aluminum siding can dent the bottom course at the rungs. Ask whether the crew uses ladder pads or stand-offs, and whether it will shift the ladder so the siding stays clear of the feet.

Ask for photos before and after. Before the crew takes a panel off, the bottom course should be photographed with a dated file, and after the panels go back up, the same spots should be photographed again. Those two sets, side by side, show what was on the wall before the crew arrived and what was left when they drove away. Keys documents the job this way and puts the written scope, the photos and the measurements in your hands, so you keep the record of the work. If you want to check any hanger point before you sign, call the office at (314) 220-2333 and ask for the crew lead to walk the eave with you.

Ask about the two weeks

Book it before the leaves have finished falling

The check that matters most is the one almost nobody does: a hose down every downspout once the trees are bare, with somebody at the bottom watching where the water actually comes out.

If you would rather not be the person on the ladder for that, say so, and tell us how many storeys we are talking about.

(314) 220-2333

Straight through to the Keys office. Roofing, gutters and downspouts only, across greater St. Louis.

A name and a number is enough. Someone from Keys will call you back.