The water path / a gutter and drainage manual for St. Louis Keys Roofing / (314) 220-2333
Seamless Gutters STLGutters · guards · drainage Call (314) 220-2333

The water path / The gutter year

Seasonal / the calendar

Lead Gutter Heads on an Older St. Louis Porch Need a Named Disposal Route

Lead outlet heads on an older porch need a named removal method, a paint test for the fascia, and a written plan for where the metal goes.

An older porch in St. Louis can carry lead where a new gutter run never would. Some pre-war and early postwar houses have cast or sheet lead outlet heads at the top of a downspout, lead flashing tucked under the trough, or fascia boards finished with lead-based paint. When a crew is hired to strip old gutters and hang new ones, each of those pieces needs an answer before the first bracket comes off. This page covers the lead heads specifically, because they are the part of the job that the old trough and the new one do not share.

Where the lead actually sits on a porch

The outlet head is the piece at the top of the downspout where the trough drains in. On a lead-era porch it may be a cast or hammered lead box, a sleeve soldered to the trough, or a sheet lead pan that bridges the porch roof edge. Lead is soft, heavy and easy to bend, so a crew that pries it loose with a bar can crease it, crack the solder joint, or drop slivers onto the decking below. The fascia behind it is another matter, because paint on boards that old may contain lead too. Lead dust from a grinder or a sander is the hazard that lasts, since it settles on porch floors, steps and the lawn where children play.

Ask the crew which of these pieces are on your house before anyone climbs. A walk with the crew lead, with the trough and each outlet photographed from the ground, takes about as long as a cup of coffee and gives you a dated record of what was there before the work started.

What the removal plan should name

A written plan for lead on a porch should say four things. It should say who removes the heads and how, whether they come down whole or are cut apart in place, and where the cut pieces go. It should say how the paint on the fascia is tested, and what happens if it tests positive. It should say how the work area is kept clean during the job. And it should say who handles the cleanup at the end, including a HEPA vacuum pass on the porch floor and a wet wipe pass on the steps before anyone in the house walks there again.

The federal Renovation, Repair and Painting rule, administered by the EPA, applies to paid work that disturbs paint in homes and child-occupied facilities built before 1978. A contractor doing that kind of work is expected to be certified under the rule and to follow its work practices, which include containment, cleaning and recordkeeping. Ask each company whether it holds EPA certification under the lead rule, and which person on the crew is the certified renovator. A gutter crew that has never heard of the rule should not be the one that removes lead heads from a porch built in 1950.

Not every older porch needs a lab test before the first cut. Some homeowners ask for a paint test on the fascia only where a hanger or a screw will be driven through the painted board. Others ask for the whole fascia line to be sampled. The choice is a cost and a schedule question, and it should be made on paper before the crew arrives, not on the porch with the bar already in the crew's hand.

Who keeps the lead

Lead has scrap value, and a crew may want to take the heads with them. That is a fair thing to ask about, but the answer has to be written down before the work starts. Put the question in the quote: who owns the removed heads, where they go, and whether a recycler will take them with a receipt. If the homeowner wants the pieces kept, say so, and ask how they will be stored until they can be handed over. A lead head left in an open truck bed or a yard bin is not a safe place for it to wait through a St. Louis summer.

Lead should not go out in a regular curb pickup. Ask the crew to name the recycler or the hazardous materials drop-off that will take the metal, and to hand you the paper showing it was delivered. A receipt with a date, a weight or count, and the name of the receiving site is the record you will want if a question comes up later about who handled the metal.

Fascia paint and the new trough

Once the lead heads are off, the fascia behind them may need its own plan. Old lead-based paint on boards is not removed by the gutter crew in most quotes, because removal is a separate job with its own containment. The practical choices are to keep the paint intact under the new hangers, to seal it, or to have it abated before the trough goes back up. A hanger screw driven through an intact painted board does not disturb much dust. Sanding or wire brushing the same board does. Name the method in the quote so the crew is not left to decide it on the ladder.

The new outlet is a different question. If the lead head is replaced with an aluminum or vinyl outlet, that outlet should be set to the same height and angle as the old one, or the splash pattern changes. Measure the old outlet from the ground to its top edge, and note where the downspout sat relative to the porch steps, before the crew takes it down. That measurement is the one thing the old lead piece gives back to the new job, and it is easy to lose once the metal is in a truck.

Gutter hangers on a porch fascia need solid wood behind them. If the fascia is thin, split or soft after years of wet weather, the hanger line may need blocking before the trough is hung. That repair is usually a separate line in the quote, and it should be named there so it does not appear later as an add-on after the lead is already gone.

Questions to ask before the first cut

  • Which outlet heads and flashing pieces are lead, and how do you know?
  • Is the fascia paint tested, and what does the plan say if it tests positive?
  • Is the firm EPA-certified under the lead rule, and who on the crew is the certified renovator?
  • Who removes the heads, and do they come down whole or in pieces?
  • Where does the lead go, who keeps the receipt, and how is the scrap weighed or counted?
  • What cleanup happens on the porch floor and steps before the crew leaves each day?
  • What is the replacement outlet height, and was it measured from the old head?

Keys Roofing documents the existing outlets, trough and fascia in a written scope with photos and measurements, and puts that scope in the homeowner's hands at the walk so it is on paper before the work starts. If the lead question changes the price or the crew, that change belongs in writing before anyone cuts. When you call the Keys office at (314) 220-2333, ask for the lead plan in writing along with the scope, and bring the photos of the old heads and the porch.

Ask about the two weeks

Book it before the leaves have finished falling

The check that matters most is the one almost nobody does: a hose down every downspout once the trees are bare, with somebody at the bottom watching where the water actually comes out.

If you would rather not be the person on the ladder for that, say so, and tell us how many storeys we are talking about.

(314) 220-2333

Straight through to the Keys office. Roofing, gutters and downspouts only, across greater St. Louis.

A name and a number is enough. Someone from Keys will call you back.