The water path / a gutter and drainage manual for St. Louis Keys Roofing / (314) 220-2333
Seamless Gutters STLGutters · guards · drainage Call (314) 220-2333

The water path / The gutter year

Seasonal / the calendar

Trough Projection Past the Fascia Sets the Drip Line

A trough set too far out or too far back changes where roof water lands, so measure the projection before the hangers go in.

A gutter trough can look right from the ground and still send roof water to the wrong place. The distance the trough sits out from the fascia face, which installers often call projection, decides whether the shingle edge and the metal drip edge drop their water into the trough or past it. Homeowners rarely ask about this number, and it is easy to miss because the trough looks straight and level once it is up. This page covers what projection does, how to check it, and what to ask before the hangers go in.

What projection means on your house

Projection is the horizontal gap between the front face of the fascia board and the front lip of the trough. Roof water runs off the edge of the shingles, over the drip edge, and falls in an arc. If the trough sits too far back under the eave, the arc lands on the trough's back wall or on the fascia itself. If it sits too far out, the arc lands on the outer lip and spills over the front before it reaches the outlet. Either way the water finds a route you did not plan for, and in St. Louis that route often ends at a wall or a walk.

The right projection depends on the drip edge the roofer installed, the pitch of the roof, and how far the shingles overhang the fascia. A steep roof throws water farther out than a low one. A roof with a wide overhang carries water beyond a trough that was set for a narrow eave. None of this is a secret, but none of it is printed on the gutter box, so it has to come from the job itself.

Where the roof water lands

Think about a rainy afternoon on a typical front eave. Water runs down the shingle course, reaches the bottom edge, and leaves the roof as a sheet. The metal drip edge at the rake and eave carries the sheet out and down. When the trough is set so the drip edge falls inside its back half, the water lands in the channel and rolls toward the outlets. When the trough is set too far back, the drip edge hangs out past the trough, and the water hits the top of the front lip or runs down the outside face of the trough and off the back of the fascia onto the wall below.

That second case is the one that stains brick and wears paint off wood. It also leaves a wet line where the fascia meets the soffit, and that line can hold moisture through a St. Louis winter. A trough that drains correctly still needs its outlets in the right place, but projection is what decides whether the water reaches the outlets at all.

Checking the projection before the hangers go up

You can check projection on a dry day with a tape and a level. Measure from the face of the fascia to the front edge of the trough at several points along the run, not only at one corner. Compare each reading to the others. A run with a few inches of variation between the ends points to a level line that was snapped crooked, or to fascia that is not flat. Either one changes the water path.

Look at the drip edge too. It should sit against the fascia and run down past the wood without a gap that lets water wick behind it. Note the height of the drip edge's outer lip against the trough's back lip. If the trough is set with its back lip below the bottom of the drip edge, water can run behind the trough. That is a common failure on older houses where the fascia has been wrapped and the original metal was never replaced.

Do this check before the trough is cut and hung, while the position can still move. Once the hangers are set into the fascia and the trough is clipped on, moving the run means pulling the hangers, patching the holes, and rehanging. Ask to see the chalk line before the first hanger goes in. The chalk line marks the height of the trough and the projection together, and it is the cheapest point in the job to correct.

What to ask the installer

Ask three direct questions. First, what projection will the trough have over the fascia, and will it be the same at each end of the run. Second, what drip edge is going on the eave, and how the trough's back lip will sit against it. Third, who checks the setting before the trough is clipped on, and whether you can watch them check it. A written answer to the first question is worth more than a verbal one, because the installer can point to it if the run is set differently on the day.

Be wary of an answer that is only "it will look right." That is an appearance answer. Projection is a measurement, and it should come back as a number on the scope or on the sketch. If a quote gives the trough size and the outlet count but says nothing about how the run is set off the fascia, the quote leaves out the one detail that decides where the water goes.

Ask also whether the drip edge is being replaced or kept. If the shingles are coming off, the drip edge often changes with them, which means the trough position may need to change too. If the gutter company is coming on a separate day from the roof crew, settle which one sets the trough height relative to the new drip edge, and get that answer in writing.

Freeze and thaw changes the stakes

St. Louis winters push water into every gap that a summer rain only touches. A trough set with the projection wrong can pour meltwater onto the same spot again and again, and that repeated wetting leaves the fascia soft by spring. The same spot is where ice bridges form at the eave. A trough that holds water in one corner is a freeze point, which is why the check belongs before the first cold week rather than after the first icicle.

If you are reading this in late fall with a run already up, you can still look. Stand on a dry day, sight along the trough from the end, and note whether the front lip sits clearly ahead of the drip edge or tucks behind it. Look at the fascia below. Staining in a clean line under the trough edge is a sign that water has been crossing the wrong way. Do not chase that stain with caulk. Ask the installer or a roofer to measure the setting and tell you what they find.

What this check does not decide

Projection is one measurement. It does not tell you the trough size, the outlet count, the hanger spacing, or the aluminum thickness, and each of those matters too. It also does not replace a look at the gutter guard if you are adding one, because a guard changes how water enters the trough. Keep this measurement on the list alongside the others.

If you have questions about a roof or gutter measurement, the Keys office can be reached at (314) 220-2333. Ask whoever sets the trough to put the projection measurement in writing and to show you the check before the hangers are set. Documentation like that is the part of the job you keep, whichever crew is standing on the ladder.

Ask about the two weeks

Book it before the leaves have finished falling

The check that matters most is the one almost nobody does: a hose down every downspout once the trees are bare, with somebody at the bottom watching where the water actually comes out.

If you would rather not be the person on the ladder for that, say so, and tell us how many storeys we are talking about.

(314) 220-2333